Nepal, being an
agriculture country, agriculture plays a major role of the economic development
of country. The economic sustainability of country primarily depends on
agriculture projection. Due to rising trend of population, the productivity
rate of farmlands cannot meet the population growth rate, so it has created a
severe problem to support the livelihood of the people at present. On the other
hand, the extensions of urban areas, industries, factories have directly
affected the agriculture production because of the encroachment of agriculture
projective land. Now, it is felt necessary to think increasing agricultural
production from existing situation. In this context, the effort is naturally
towards increasing agricultural productivity for which irrigation is the main
input without which other inputs remain less effective.
Recently, The Government
of Nepal (GoN) has changed its strategy for developing big projects in
irrigation sub-sector because of their heavy investment, long gestation period
and management difficulties. The present irrigation policy gives more emphasis
on the rehabilitation and construction of small irrigation schemes because of
their low investment, short gestation and capital recovery periods and easy
operation and maintenance. The other benefits from these small schemes include
active participation of beneficiaries and relatively uncomplicated construction
technology. Among the various small irrigation schemes, groundwater projects
are placed at higher priority.
The experts believe that
there is high potential of ground water development within the country. In the
areas where the availability of surface water is scarce, ground water can be
the best alternative for the irrigation. Although these are the facts it is
also reported that many tube well systems are not working due to lack of
rehabilitation in the systems which was beyond the capacity of users. To
analyze the condition of those old tube well DOI has decided to make a study
about the utility of those old tube well to provide irrigation facility to the
concern farmars as per the rules and regulation of Irrigation of GON The study focused to decide and recommend
whether or not it is technically and economically justifiable to invest in the
tube well rehabilitation.
.
1.1.2 Project Background
1.2 Objectives
The main objectives of this study are to carryout
feasibility of the rehabilitation of DTW in Mahottari , Dhanusa and Sarlahi
Districts.
1.3 Scope of the work
The scope of the work of proposed study shall
include but not limited to the followings
1.
Inventory of all deep tubewell
2.
Existing condition of DTW system
3.
Requirement of rehab of DTWs system
4.
Cost estimate of rehab work of every tubewell system
5.
Socio-economic aspect of rehab work
6.
Economic analysis
7.
Suggestion and recommendation for the improvement and
sustainability of the system
8.
Reason for the system being non functioning
9.
Location of wells
1.4. Project area
As specified by the office the Deep tube
wells that are to be studied are as follows
|
District
|
Name of DTWs and number
|
|
Mahottaria
|
Laxmaniya(M11,M33,M41), Hatilet(M12),
Mahottari (M17), Bhargebser(M18) Shreepur(M14) Bisambharpur(M15)
Bijalpura(M21,M34,M42), Dhamaura(M24), Pasupatinagar (M31) Pipra(M36), Ekrhiya(M39), Dhirapur(M40) Pagauna(M49), Ramnagar( M19), Bellgachi( M29), Gausala(M37) , Kisanhagar(M45)
|
|
Dhanusa
|
Kumraul(D1), Sugamadhukarhi(D2), Sinurjauda(D3)
|
|
Sarlahi
|
Bbargang(S1), Gaurisankar(S2), Dhankaul(S3)
|
Fig: 1 Location of
DTWs at Mahottari district
1.4 APPROACH AND METHODOLOGY
The consultant team has followed following
approach and methodology for preparing the feasibility report of rehabilitation
of 28 DTWs of Mahottari , Dhanusa and Sarlahi District
1.4.1 Desk Study
The collection of
information has been stated from the desk study. The important documents
studied during the course of desk study are Irrigation Policy 2060, Water Resources
Act 1992, Water Resources Strategy 2002, Design Manuals for Irrigation Project
in Nepal 1990 (PDSP manual), IWRMP procedural Guidelines for Farmer Managed
Surface Irrigation Systems 2009, Climate Records of Nepal 2010, Precipitation
Records of Nepal 2010, Water Inventory Study of Mahottari, Sarlahi and Dhanusa district
Agricultural Perspective Plan (APP) 1997, Reassessment of groundwater
development strategy for irrigation in the Terai 1994, and District Irrigation
profile of Mahottari district and
Regional Agriculture Profile of Nepal. In addition, topographical and land use
maps of the study area have also been verified.
1.4.2 Fieldwork
As per the proposed fieldwork schedule, the
team of experts has performed the study with close co-ordination with WUA
members, beneficiaries and stakeholders. The details of the field survey
procedure according to which the field study were conducted are described
below.
Walk-through
The team of experts and the leading farmers
has conducted a walk-through survey immediately after reaching the project
site. The walk-through was carried out through the investigation tube wells as
well as in production tube wells. General over view of the sub-project area,
topography, and existing irrigation situation have been studied and compared
with the information collected in the review work. During this survey,
information on other aspects such as history of existing systems, deforestation
and other environmental degradation of the watershed, etc., have also been
discussed with the farmers.
Discussion with the Farmers
Views and suggestions of the farmers
regarding project planning have been noted by the expert team of consultant.
The GBO official has also clarified doubts and confusions on the parts of the
water users. As the groundwater technology is not as simple as that of surface
irrigation, the consultant has also been informed and explained the operation
and maintenance needs of the DTW.
On the basis of the tentative irrigation
development plan agreed upon in the meeting with the farmers, further
groundwater investigations and survey work has been conducted. The major works
carried out were:
·
Identification and conformation of command area
proposed by the farmers,
·
Assessment of hydro-geological information of the
sub-project, the sources of information on the hydro-geology in this area have
been obtained from various reports and maps.
·
Assessment of agricultural data and information
including cropping pattern, cropping calendar, major crops grown, inputs for
farming practices, and market accessibility for agricultural projects,
·
Socio-economic overview of the sub-project area,
which included the information of major ethnic composition, demography, gender
issues, economic activity of the populace, food sufficiency situation, primary
health and education facilities, literacy etc.,
·
Preliminary environmental issues and concerns have
identified and discussed with farmers for Initial Environmental Examination
(IEE), which included the groundwater pollution, if any, deforestation in the
adjacent area, erosion, landslides, etc.,
1.4.3 Analysis of Data and Report Writing
After the collection of information and data
from the field, the Consultants rigorously analyzed the data with respect to
tube well status. Identification of the
issues in the wells (Presented in table 1) and made the design of the required
infrastructure along with Compilation
of meteorological and hydro-geological data. Assessment of water requirement
for various crops, design of required infrastructure such as, design of pump
house, water distribution system, electrification system and pump design were
made as per the requirement however the capacity of the well was taken from the
existing well data and information from the farmer.
1.5 Details of the individual wells
1.5.1 Phulhatta
Phulhatta (M35) lies in the N260 40.859 and E 85 0
49.404.of Mahottari District. It was observed that the tube well is
running in good state having VT pump and pump house. But there was no
distribution system. As discussed with
the farmer and the office staff the need of the system is that the well should
be installed with submersible pump, as the operation of VT pump was expensive
and complicated. It was observed that the well should be equipped with
submersible pump with the erection of electrification. The distribution system
has to be made so that people can irrigate their land with minimum water loss
and it was the demand of farmers too. The length of electrification is within
500m. It was found that the WUA is functioning in good way. The number of
household observed was 28 and benfisaries are 154 people. The total commnd area
of the system is 40ha. Although the command area of the well is 40 ha at
present due to the lack of distribution system it is actually irrigating only
20 or less than 20ha of land so the development of the system could irrigate more
than 40 ha of irrigable land.
1.5.2 Mahottary ( M17)
M17 DTW lies at Mahottary VDC of
Mahottary district. Coordinate of the DTW is N260 41.411’.and E850
49.188’. The tubewell is not in
operation since more than 25 years. The well has to be tested before doing any
further work. However the development of the systems in this well could benefit
more than 50 household and can irrigate more than 40 ha of land.
1.5.3 Pipra ( M36)
1.5.4 Ekrahiya ( M39)
1.5.5 Dhirapur (M40 DTW)
M40 DTW lies in Dhirapur Vdc of
mahottary district. Coordinate of the
DTW is N260 39.217’ and E 85052.447’. It was observed
that the tubewell is free flowing with discharge 2.5lt/s. But there was no
distribution system. As discussed with
the farmer and the office staff the need of the system is that the well should
be installed with submersible pum to increase the efficiency of the tubewell so
that it could fullfil the demand of water to irrigate thei agricultcural land .
It was observed that the well should be equipped with submersible pump with the
erection of electrification. The distribution system has to be made so that
people can irrigate their land with minimum water loss and it was the demand of
farmers too. The lenth of electrification are with the length of 900m. It was
found that the WUA IS FUNCTANIng in good way. The number of household observed
was 40and benfisaries are 170people . the total commnd area of the system is
40ha. Command area of the well is 40 ha.
But due to lack of distribution system low discharge it is actually irrigating
only 10ha. Of land so the development of the system could irrigate more than 40
ha of irrigable land.
1.5.6
pigauna(M49)
M49 DTW lies in pigauna Vdc of
mahottary district. Coordinate of the DTW is N260 39.246’ and E 850 49.360.
’ As discussed with the farmer and the office staff the need of the system is
that the well should be installed with submersible pum to increase the
efficiency of the tubewell so that it could fullfil the demand of water to
irrigate thei agricultcural land . It was observed that the well should be
equipped with submersible pump with the erection of electrification. The
distribution system has to be made so that people can irrigate their land with
minimum water loss and it was the demand of farmers too. The lenth of
electrification are with the length of 900m. It was found that the WUA IS
FUNCTANIng in good way. The number of household observed was 40and benfisaries
are 170people . the total commnd area of the system is 40ha. Although the
command area of the well is 40 ha. At present due to the lack of distribution
system it is actually irrigationg only 10ha. Of land So the development of the
system could irrigate more than 40 ha.of irrigable land.
1.5.7. Bhargebser ( M18)
1.5.8 M14 (Shreepur)
M14 lies in Shreepur Vdc of
mahottary district. Coordinate of the
DTW is N260 51.736’ and E 85046.938.
It was observed that the tubewell is free flowing with discharge 3 l/s. But
there was no distribution system. As
discussed with the farmer and the office staff the need of the system is that
the well should be installed with submersible pum to increase the efficiency of
the tubewell so that it could fullfil the demand of water to irrigate thei
agricultcural land . It was observed that the well should be equipped with
submersible pump with the erection of electrification. The distribution system
has to be made so that people can irrigate their land with minimum water loss
and it was the demand of farmers too. The lenth of electrification are with the
length of 900m. It was found that the WUA IS FUNCTANIng in good way. The number
of household observed was 40and benfisaries are 170people . the total commnd
area of the system is 40ha. Although the command area of the well is 40 ha. At
present due to the lack of distribution system it is actually irrigationg only 10ha. Of land So the development of
the system could irrigate more than 40 ha.of irrigable land.
1.5.9 Laxmaniya (M41)
M41 DTW lies in LaxmaniyaVDC of Mahottary district. Coordinate of the
DTW is N260 57.604’ and E850 45.840’. It was observed that the tubewell is
running in good state having VT pump and pump house. But there was no
distribution system. As discussed with
the farmer and the office staff the need of the system is that the well should
be installed with submersible pump as the operation of VT pump was expensive
and complicated. It was observed that the well should be equipped with
submersible pump with the erection of electrification. The distribution system
has to be made so that people can irrigate their land with minimum water loss
and it was the demand of farmers too. The lenth of electrification are within
the length of 500m. It was found that the WUA IS FUNCTANIng in good way. The
number of household observed was 28 and benfisaries are 154 people . the total
commnd area of the system is 40ha. Although the command area of the well is 40
ha. At present due to the lack of distribution system it is actually irrigating
only 20ha. Of land So the development of the system could irrigate more than 40
ha.of irrigable land.
1.5.10 Laxmaniya(M33)
1.5.11 Laxamaniya( M11)
1.5.12 Belgachhi (M29 )
M29 DTW liesin BelgachhiVdc of mahottary
district. Coordinate of the DTW is N260 58.073 and E 850 48.068.
It was observed that the tubewell is in good state having VT pump and pump
house without distribution system. But the tubewell was not in operation since
last 4months due to mechanical problem in VTpump. As discussed with the farmer
and the office staff the need of the system is that the well should be
installed with submersible pump as the operation of VT pump was expensive and
complicated. It was observed that the well should be equipped with submersible
pump with the erection of electrification. The distribution system has to be
made so that people can irrigate their land with minimum water loss and it was
the demand of farmers too. The lenth of electrification are with the length of
500m. It was found that the WUA IS FUNCTANIng in good way. The number of
household observed was 28 and benfisaries are 154 people . the total commnd
area of the system is 40ha. Although the command area of the well is 40 ha. At
present due to the lack of distribution system it is actually irrigationg only
20ha. Of land So the development of the system could irrigate more than 40
ha.of irrigable land.
1.5.13 Ramnagar(M19)
M19 DTW lies inRamnagar Vdc of
mahottary district. Coordinate of the
DTW is N260 57.313and E 850
49.613. It was observed that the
tubewell is running in good state having . VT pump and pump house. But there
was no distribution system. As discussed
with the farmer and the office staff the need of the system is that the well
should be installed with submersible pump as the operation of VT pump was
expensive and complicated. It was observed that the well should be equipped
with submersible pump with the erection of electrification. The distribution
system has to be made so that people can irrigate their land with minimum water
loss and it was the demand of farmers too. The lenth of electrification are
with the length of 1km. It was found that the WUA IS FUNCTANIng in good way.
The number of household observed was 30 and benfisaries are 150 people . the total
commnd area of the system is 40ha. Although the command area of the well is 40
ha. At present due to the lack of distribution system it is actually
irrigationg only 20ha.
1.5.14 Bijalapura(M2 )
M21 DTW liesin BijalapuraVdc of mahottary district. Coordinate of the DTW is N260 48.851’ and E 850 45.841’.
It was observed that the tubewell is in good state having VT pump and pump
house without distribution system. But the tubewell is not in operation since
last seven years due to mechanical problem in VTpump. As discussed with the
farmer and the office staff the need of the system is that the well should be
installed with submersible pump as the operation of VT pump was expensive and
complicated. It was observed that the well should be equipped with submersible
pump with the erection of electrification. The distribution system has to be
made so that people can irrigate their land with minimum water loss and it was
the demand of farmers too. The lenth of electrification are with the length of
500m. It was found that the WUA IS FUNCTANIng in good way. The number of
household observed was 28 and benfisaries are 154 people . the total commnd
area of the system is 40ha. Although the command area of the well is 40 ha. At
present due to the lack of distribution system it is actually irrigationg only
20ha. Of land So the development of the system could irrigate more than 40
ha.of irrigable land.
1.5.15 Bijalapura ( M42)
1.5.16 Bijalapura(M34)
1.5.17 pashupatinagar( M 31)
M 31 DTW liesin pashupatinagarVdc
of mahottary district. Coordinate of the
DTW is N260 54.371 and E 850 52.990. It
was observed that the tubewell is in good state having pump house without
distribution system. But the tubewell was not in operation since last twelveyears
due to mechanical problem in VTpump . As discussed with the farmer and the
office staff the need of the system is that the well should be installed with
submersible pump as the operation of VT pump was expensive and complicated. It
was observed that the well should be equipped with submersible pump with the
erection of electrification. The distribution system has to be made so that
people can irrigate their land with minimum water loss and it was the demand of
farmers too. The lenth of electrification are with the length of 100m. It was
found that the WUA IS FUNCTANIng in good way. The number of household observed
was 28 and benfisaries are 154 people . the total commnd area of the system is
40ha. Although the command area of the well is 40 ha. At present due to the
lack of distribution system it is actually irrigationg only 20ha. Of land So
the development of the system could irrigate more than 40 ha.of irrigable land.
1.5.18 Kisannagar (M45)
M45 DTW lies in Kisannagar VDC of
mahottary district. Coordinate of the DTW is N260 56.232 and E85052.738’.
It was observed that the tubewell is in good state but due to uninstualment of
pump system, tte tubewell is not operated since it was constructed. As
discussed with the farmer and the office staff the need of the system is that
the well should be installed with submersible pump. It was observed that the
well should be equipped with submersible pump with the erection of
electrification. The distribution system has to be made so that people can irrigate
their land with minimum water loss and it was the demand of farmers too. The
lenth of electrification are with the length of 500m. It was found that the WUA
IS FUNCTANIng in good way. The number of household observed was 28 and
benfisaries are 154 people . the total commnd area of the system is 40ha.
Although the command area of the well is 40 ha. At present due to the lack of
distribution system it is actually irrigationg only 20ha. Of land So the
development of the system could irrigate more than 40 ha.of irrigable land.
1.5.19 Gaushala (M37)
1.5.20 Bishamverpur (M15 )
M15 lies in Bishamverpur Vdc of mahottary
district. Coordinate of the DTW is N260 48.931’ and E 85049.068’.
It is observed that the tubewell is free flowing with discharge2 l/s. But there
was no distribution system. As discussed
with the farmer and the office staff the need of the system is that the well
should be installed with submersible pump to increase the efficiency of the
tubewell so that it could fullfil the demand of water to irrigate thei
agricultcural land . It was observed that the well should be equipped with
submersible pump with the erection of electrification. The distribution system
has to be made so that people can irrigate their land with minimum water loss
and it was the demand of farmers too. The lenth of electrification are with the
length of 900m. It was found that the WUA IS FUNCTANIng in good way. The number
of household observed was 40and benfisaries are 170people . the total commnd
area of the system is 40ha. Although the command area of the well is 40 ha. At
present due to the lack of distribution system it is actually irrigationg only 10ha. Of land So the development of the
system could irrigate more than 40 ha.of irrigable land.
1.5.21 Dhamaura(M24)
M24 DTW lies in Dhamaura VDC of mahottary
district. Coordinate of the DTW is N260 48.931’ and E 85049.068’.
It was observed that the tubewell is free flowing with discharge2.5 l/s. But
there was no distribution system. As
discussed with the farmer and the office staff the need of the system is that
the well should be installed with submersible pump to increase the efficiency
of the tubewell so that it could fullfil the demand of water to irrigate thei
agricultcural land . It was observed that the well should be equipped with
submersible pump with the erection of electrification. The distribution system
has to be made so that people can irrigate their land with minimum water loss
and it was the demand of farmers too. The lenth of electrification are with the
length of 900m. It was found that the WUA IS FUNCTANIng in good way. The number
of household observed was 40and benfisaries are 170people . the total commnd
area of the system is 40ha. Although the
command area of the well is 40 ha. At present due to the lack of distribution
system it is actually irrigationg only 10ha. Of land So the development of the
system could irrigate more than 40 ha.of irrigable land.
1.5.22 Hatilet( M12)
1.5.23 Babarganj( S1)
S1 DTW lies in Babarganj VDC of
Sarlahi district. Coordinate of the DTW
is N260 48.931’ and E 85049.068’. It was
observed that the tubewell is free flowing with discharge3 l/s. But there was
no distribution system. As discussed
with the farmer and the office staff the need of the system is that the well
should be installed with submersible pump to increase the efficiency of the
tubewell so that it could fullfil the demand of water to irrigate thei
agricultcural land . It was observed that the well should be equipped with
submersible pump with the erection of electrification. The distribution system
has to be made so that people can irrigate their land with minimum water loss
and it was the demand of farmers too. The lenth of electrification are with the
length of 900m. It was found that the WUA IS FUNCTANIng in good way. The number
of household observed was 40and benfisaries are 170people . the total commnd
area of the system is 40ha. Although the command area of the well is 40 ha. At
present due to the lack of distribution system it is actually irrigationg only 10ha. Of land So the development of the
system could irrigate more than 40 ha.of irrigable land.
1.5.24 Gaurishankar (S2)
S2 DTW lies in Gaurishankar VDC
of Sarlahi district. Coordinate of the
DTW is N260 48.931’ and E 85049.068’. It
was observed that the tubewell is free flowing with discharge2 l/s. But there
was no distribution system. As discussed
with the farmer and the office staff the need of the system is that the well
should be installed with submersible pump to increase the efficiency of the
tubewell so that it could fullfil the demand of water to irrigate thei agricultcural
land . It was observed that the well should be equipped with submersible pump
with the erection of electrification. The distribution system has to be made so
that people can irrigate their land with minimum water loss and it was the
demand of farmers too. The lenth of electrification are with the length of
900m. It was found that the WUA IS FUNCTANIng in good way. The number of
household observed was 40and benfisaries are 170people . the total commnd area
of the system is 40ha. Although the command area of the well is 40 ha. At
present due to the lack of distribution system it is actually irrigationg only 10ha. Of land So the development of the
system could irrigate more than 40 ha.of irrigable land.
1.5.25 Dhankaul( S3)
S2 DTW lies in Gaurishankar VDC of Sarlahi
district. Coordinate of the DTW is N26 48.931’ and E 85 49.068’. It was observed
that the tubewell is free flowing with discharge2 l/s. But there was no
distribution system. As discussed with
the farmer and the office staff the need of the system is that the well should be
installed with submersible pump to increase the efficiency of the tubewell so
that it could fullfil the demand of water to irrigate thei agricultcural land .
It was observed that the well should be equipped with submersible pump with the
erection of electrification. The distribution system has to be made so that
people can irrigate their land with minimum water loss and it was the demand of
farmers too. The lenth of electrification are with the length of 900m. It was
found that the WUA IS FUNCTANIng in good way. The number of household observed
was 40and benfisaries are 170people . the total commnd area of the system is
40ha. Although the command area of the well is 40 ha. At present due to the
lack of distribution system it is actually irrigating only 10ha. Of land So the
development of the system could irrigate more than 40 ha.of irrigable land
1.5.26 Kumaraul (D1)
D1 DTW lies at KumaraulVdc of
Dhanusa district. Coordinate of the DTW
is N260 54.368’ and E 850
48.469’. It was observed that the tubewell is in good state having VT
pump and pump house without distribution system. As discussed with the farmer
and the office staff the need of the system is that the well should be
installed with submersible pump as the operation of VT pump was expensive and
complicated. It was observed that the well should be equipped with submersible
pump with the erection of electrification. The distribution system has to be
made so that people can irrigate their land with minimum water loss and it was
the demand of farmers too. The lenth of electrification are within the length of 1.5km. It was found that the
WUA IS FUNCTANIng in good way. The number of household observed was 28 and
benfisaries are 154 people . the total commnd area of the system is 40ha.
Although the command area of the well is 40 ha. At present due to the lack of
distribution system it is actually irrigationg only 20ha. Of land So the
development of the system could irrigate more than 40 ha.of irrigable land.
1.5.27 Sugamadhukarhi( D2)
D2 DTW lies in Sugamadhukarhi VDC of Dhanusha
district. Coordinate of the DTW is N260 48.931’ and E 85049.068’. It was
observed that the tubewell is free flowing with discharge3.5l/s. But there was
no distribution system. As discussed
with the farmer and the office staff the need of the system is that the well
should be installed with submersible pump to increase the efficiency of the
tubewell so that it could fullfil the demand of water to irrigate thei
agricultcural land . It was observed that the well should be equipped with
submersible pump with the erection of electrification. The distribution system
has to be made so that people can irrigate their land with minimum water loss
and it was the demand of farmers too. The lenth of electrification are with the
length of 900m. It was found that the WUA IS FUNCTANIng in good way. The number
of household observed was 40and benfisaries are 170people . the total commnd
area of the system is 40ha. Although the command area of the well is 40 ha. At
present due to the lack of distribution system it is actually irrigationg only 10ha. Of land So the development of the
system could irrigate more than 40 ha.of irrigable land.
1.5.28 Sinurjauda( D3)
D3 DTW lies in Sinurjauda VDC of Dhanusha
district. Coordinate of the DTW is N260 48.931’ and E 85049.068’.
It was observed that the tubewell is free flowing with discharge 4.5l/s. But
there was no distribution system. As
discussed with the farmer and the office staff the need of the system is that
the well should be installed with submersible pump to increase the efficiency
of the tubewell so that it could fullfil the demand of water to irrigate thei
agricultcural land . It was observed that the well should be equipped with
submersible pump with the erection of electrification. The distribution system
has to be made so that people can irrigate their land with minimum water loss
and it was the demand of farmers too. The lenth of electrification are with the
length of 900m. It was found that the WUA IS FUNCTANIng in good way. The number
of household observed was 40and benfisaries are 170people . the total commnd
area of the system is 40ha. Although the command area of the well is 40 ha. At
present due to the lack of distribution system it is actually irrigationg only
10ha. Of land. So the development of the system could irrigate more than 40
ha.of irrigable land.5.29 Summary of DTW status It iis stated in the table
below
Table
1 Identification
of the issues in the wells
|
Mahottari
|
||||||||||
|
S.N
|
Well No.
|
Location
|
Drilling Date
|
Tubewell
condition
|
Dist. Sys.
|
pump type
|
Electrification
|
Remark
|
||
|
1
|
M35
|
Phulhatta
|
044/045
|
good
|
No
|
V.T
|
500m
|
Initially f.f
|
||
|
2
|
M17
|
Mahottari
|
041/042
|
bad
|
No
|
no pump
|
|
Need to be
retested
|
||
|
3
|
M36
|
Pipara
|
044/045
|
good
|
No
|
no pump
|
400m
|
|
||
|
4
|
M39
|
Ekrahiya
|
046/047
|
good
|
No
|
no pump
|
1km
|
|
||
|
5
|
M40
|
Dhirapur
|
046/047
|
good
|
No
|
no pump
|
300m
|
|
||
|
6
|
M49
|
Pigauna
|
056/057
|
good
|
No
|
no pump
|
300m
|
No pump & pumo
house
|
||
|
7
|
M18
|
Bhargebser
|
042/043
|
good
|
No
|
V.T
|
|
|
||
|
8
|
M14
|
Shreepur
|
041/042
|
good
|
No
|
no pump
|
200m
|
|
||
|
9
|
M37
|
Gausala
|
044/045
|
good
|
No
|
V.T.
|
600m
|
|
||
|
10
|
M11
|
Laxmaniya
|
041/042
|
good
|
No
|
V.T.
|
800m
|
|
||
|
11
|
M33
|
Laxmaniya
|
044/045
|
good
|
No
|
V.T.
|
2km
|
|
||
|
12
|
M41
|
Laxmaniya
|
046/047
|
good
|
No
|
V.T.
|
|
|
||
|
13
|
M29
|
Belgachhi
|
043/044
|
good
|
No
|
V.T.
|
|
|
||
|
14
|
M19
|
Ramnagar
|
042/043
|
good
|
No
|
V.T.
|
450m
|
|
||
|
15
|
M21
|
Bijalpura
|
042/043
|
good
|
No
|
V.T.
|
500m
|
|
||
|
16
|
M42
|
, Bijalpura
|
046/047
|
good
|
No
|
V.T.
|
600m
|
|
||
|
17
|
M34
|
,Bijalpura
|
044/045
|
good
|
No
|
V.T.
|
200m
|
|
||
|
18
|
M31
|
Pashupatinagar
|
043/044
|
good
|
No
|
no pump
|
100m
|
VT damageged
by flood
|
||
|
19
|
M45
|
Kishan Nagar
|
055/056
|
good
|
No
|
no pump
|
500m
|
No pummp &
pump house
|
||
|
20
|
M12
|
Hatilet
|
041/042
|
good
|
No
|
V.T.
|
1km
|
|
||
|
21
|
M15
|
Bishamverpur
|
041/042
|
good
|
No
|
no pump
|
200m
|
|
||
|
22
|
M24
|
Dhamaura
|
043/044
|
good
|
No
|
no pump
|
800m
|
|
||
|
Sarlahi
|
|
|||||||||
|
1
|
s1
|
Babarganj
|
056/057
|
good
|
No
|
no pump
|
600m
|
|
||
|
2
|
s2
|
Gaurisankar
|
056/057
|
good
|
No
|
no pump
|
400m.
|
|
||
|
3
|
s3
|
Dhanakaul
|
057/058
|
good
|
No
|
no pump
|
1k.m.
|
|
||
|
Dhanusa
|
|
|||||||||
|
1
|
D1
|
Kumaraul
|
067/068
|
good
|
no
|
no pump
|
500m
|
|
||
|
2
|
D2
|
Sugamadhukarhi
|
068/069
|
good
|
no
|
no pump
|
400m.
|
|
||
|
3
|
D3
|
Sinurjauda
|
068/069
|
good
|
no
|
no pump
|
600m
|
|
||
1.5.30 Requirement of infrastructure to be constructed on the basis of above information
|
S.N.
|
Description of work
|
Nos.
|
Remarks
|
|
1
|
Deep tube well
development and testing
|
28 TW
|
|
|
2
|
Electro-mechanical Works
|
28 TW
|
|
|
3
|
Civil works (Distribution System and pump house)
|
28TW
|
|
2. TECHNICAL ASSESSMENT AND DESIGN
2.1 CROP WATER REQUIREMENTS
2.1.1 Air temperatures, Rainfall, Eto, Eco and Humidity
Meteorological
station is not available within the project area. The nearest metrological stations is Jankapur
Airport (Station no 1111). The mean monthly temperature, wind velocity,
sunshine hours, relative humidity, pan evaporation and rainfall records for
each month required for the calculation of crop water requirement have obtained
from the reliable source. The reference crop evapo-transpiration (ET0) for each
month has been estimated by using Penman Equation as indicated in FAO-24. For
detailed procedures of calculating ETo "PDSP M.3 Hydrology and
Agro-meteorological Manual" is referred. The results of Eto along with the
climatic data are presented in Table 2.1.
Table 2.1: Metrological Data of the study area
|
Month
|
|
Jan
|
Feb
|
Mar
|
Apr
|
May
|
June
|
July
|
Aug
|
Sep
|
Oct
|
Nov
|
Dec
|
Avg
|
|
Rainfall
|
Mm
|
9
|
16
|
12
|
12
|
41
|
185
|
354
|
231
|
242
|
66
|
17
|
7
|
99.33
|
|
Min Temp
|
°C
|
9.4
|
11.6
|
17.6
|
23.7
|
24.1
|
25.3
|
24.9
|
24.9
|
25.1
|
23.2
|
17.5
|
10.4
|
15.4
|
|
Max Temp
|
°C
|
18.2
|
26.0
|
32.9
|
36.3
|
36.0
|
36.0
|
34.9
|
34.3
|
33.6
|
32.3
|
28.5
|
24.0
|
27.1
|
|
Humidity
|
Relative
%
|
96.4
|
88.1
|
78.8
|
73.6
|
75.3
|
74.0
|
66.3
|
73.5
|
85.6
|
82.9
|
91.1
|
90.7
|
81.35
|
|
|
Vapour
Pressure
|
1.19
|
1.27
|
1.53
|
1.73
|
2.24
|
2.96
|
3.06
|
3.128
|
2.99
|
2.34
|
1.6
|
1.26
|
2.11
|
|
Wind
|
km/day
|
76.6
|
84
|
102
|
122
|
127
|
110
|
87.8
|
84
|
70.6
|
66.7
|
54.5
|
54.5
|
86.6
|
|
Sunshine
|
hours
|
7.15
|
7.83
|
8.15
|
8.35
|
7.68
|
5.3
|
5.97
|
5.633
|
4.77
|
6.75
|
7.65
|
7.48
|
6.9
|
|
Radiation
|
MJ/m2/day
|
13.5
|
16.3
|
19.3
|
21.5
|
18.1
|
19
|
17.7
|
15.2
|
15.7
|
14.4
|
13.1
|
17.1
|
16.7
|
|
ETo
|
mm/day
|
1.82
|
2.42
|
3.57
|
4.83
|
4.99
|
3.95
|
3.87
|
3.57
|
3.02
|
3
|
2.28
|
1.73
|
3.25
|
|
Half Monthly
|
1st
|
1.8
|
2.27
|
3.28
|
4.52
|
4.95
|
4.21
|
3.89
|
3.65
|
3.16
|
3.01
|
2.46
|
1.87
|
|
|
|
2nd
|
1.97
|
2.71
|
3.89
|
4.87
|
4.73
|
3.93
|
3.8
|
3.43
|
3.02
|
2.82
|
2.14
|
1.75
|
|
2.1.2 Crop Coefficients and Irrigation Efficiency
Crop coefficients for deriving crop water
requirements for the various existing and proposed crops in subproject area
have been taken form PDSP Manual. In the design of water distribution system
irrigation efficiency is considered as one of the prime factors. The irrigation
efficiency is defined as the ratio of water delivery to water supply in the
particular stretch of the canal system. In the proposed groundwater irrigation
buried pipes are designed for conveying water up to distribution boxes. These
pipes are of uPVC and have negligible loss of water in conveyance. The
efficiency of these pipes is taken as 90%. The water up to farm field is
distributed with open earthen channel, where water is lost due to evaporation,
seepage and percolation. The efficiency of these field channels is taken as
60%.
2.1.3 Pumping Water Requirement Computations
The water requirements
have been computed using the water balance computation sheet for each crop.
These sheets are provided in Annex . ET0, crop coefficients and 80% exceedence
rainfall data have been adopted as mentioned above. Etcrop is obtained by
multiplying ET0 with crop coefficients. Land preparation requirements for
summer paddy crop have been taken as 55 mm for first two-fortnight period and
50 mm for the following two-fortnight periods. The deep percolation losses are
taken as 75 mm/day, as prescribed for loamy soil type. For non-paddy crops,
water requirements for land preparation are not considered as it is met by soil
moisture storage, except in the case of wheat for which 60 mm is applied to
improve germination. The net crop water requirements have been computed by
subtracting effective rainfall from the total crop water requirements. The
water requirements calculation shows, the maximum irrigation water requirement
for 1120 ha of developed area is1036.6lps in April first 15 days..
2.2 Computations of equipments design and capacity to be installed in the ground water irrigation system
The well constructed data shows that all
wells that are proposed to rehab have capacity to produce 40lit/sec of water
and on the basis of the well parameters below mention capacities are made
2.2.1 Pump Capacity Calculation
In designing
the pump for the tube well, it becomes necessary to use the most critical
situation for the design. This is due to the fact that the use of groundwater
as a source for both irrigation and domestic water supply is very popular in
the area. The most critical situation in the design of a submersible pump is
when the maximum possible dynamic groundwater level in the well falls lower
than the provided pump casing depth. The total head includes losses in the
non-return valve, bends and the pump mechanism in addition to the calculated
drawdown and delivery losses in the uPVC
distribution network if any. There is still sufficient margin for future
increase in drawdown due to possible extensive use of groundwater in the area.
The delivery head is taken
to be 5.5 meter excluding losses in pipe up to the elevated header tank and
other losses due to fittings etc. In this system, the distribution system
doesn't utilize the delivery head produced by the pump directly. However, this includes
losses in the bends, joints and frictional losses in the uPVC pipes up to the
elevated header tank. Thus the maximum design dynamic head is calculated. The
well is designed to produce a discharge of 40 lit./sec. On this basis, the
capacity of the required pump is calculated as:
Where, ρ = unit weight of fluid
being pumped in Kg / m3 , Q = required design discharge of
the tube well in cumec , g = gravitational constant (9.81 m / s2),
np = efficiency taken as (0.75)
H = total head in meters against which the pump has to
work
2.2.2 Determination of total head against which the pump has to work.
The total head against the
pump has to work is the function of the following parameters
i.
Head
loss due to friction in pipe
ii.
Velocity
Head
iii.
SWL
( Depth of Static Water Level)
iv.
Drawdown
(S) i.e Maximum Depression Head
v.
Delivery
head up to the Elevated Header Tank
vi.
Annual
fluctuation in water level in the well etc.
vii.
Entry
loss in Strainer, Bends and Fittings etc.
(i)
Head loss due to friction in pipe
Where, f = coefficient of
friction assumed as 0.006, l = Length of pipe m
g = gravitational constant (9.81 m / sec2), d
= Diameter of pipe in m
V= Velocity through pipe
Table
2.2 Calculation of Velocity through Pipe
|
Discharge (Q)
|
Diameter of Pipe (d) m
|
Xn Area
|
V
|
Remark
|
|
m3/s
|
m
|
m2
|
m/s
|
|
|
|
d
|
p*r2
|
Q/A
|
|
|
0.04
|
0.2
|
0.031
|
1.29
|
|
Table 2.3 Calculation of Frictional Loss (Hf)
|
F
|
L
|
v
|
g
|
d
|
Hf
|
Remark
|
|
|
M
|
m/s
|
m/sec2
|
m
|
M
|
|
|
0.006
|
50
|
1.29
|
9.81
|
0.2
|
0.51
|
|
(ii)
Velocity Head
Table 2.4 Calculation of Velocity and Velocity head
|
Discharge
|
Dia
of Pipe (d)
|
Xn
Area
|
V
|
Velocity
head
|
Remark
|
|
m3/s
|
M
|
m2
|
m/s
|
M
|
|
|
Q
|
D
|
p*r2
|
Q/A
|
V2/2*g
|
|
|
0.04
|
0.2
|
0.031
|
1.29
|
0.08
|
|
(iii)
Depth of Static Water Level (SWL)
During the
well inventory and observations of the project area it is assumed that the
static water level in the project area lies approximately below 15 m from the
existing ground level.
(iv)
Drawdown Calculation
Hydraulic
losses due to flow in the aquifer and hydraulic losses due to flow into and up
the well are responsible for drawdown in the well. The aquifer loss is
inversely proportional to Transmissivity (T) and hence to the product of
constant permeability (Hydraulic Conductivity K) and the yielding aquifer
thickness (D).
T=K*D=K* Fn
{L}
Therefore, as
L (thickness of aquifer) increases, T also increases and therefore the Drawdown
decreases.
Similarly,
hydraulic losses due to flow into and up the well are function of screen
(length, open area and diameter etc.), gravel pack design and how efficiently
the well has been developed.Aquifer drawdown can be predicted by Theis method
or its variants corrected for boundary conditions where necessary. For this
project purpose this method is unnecessarily complex and hence following
simpler method has been purposed. A generally accepted empirical equation
describing a well's performance is given by Logan’s approximation:
S=1.32*Q/(K*L)
Where, S = Drawdown (m), Q = Well
discharge (m3/day)
K = Aquifer Permeability
(0.4 to 204 m/day in natural aquifers) , L=Screen Length (m)
Table 2.6Calculation of
Drawdown
|
Hydraulic Conductivity K
|
Discharge
|
Screen Length
|
Drawdown
|
|
Logan's
approximation
|
|
m/day
|
M3/day
|
m
|
S
|
|
|
|
K
|
Q
|
SL
|
1.32*Q/(K*SL)
|
|
|
|
10
|
3456
|
24.00
|
22.809
|
|
(v) Delivery
head up to the Elevated Header Tank =5.5 m
(vi) Annual
fluctuation in water level in the well etc =4.0 m
(vii) Entry loss in Strainer, Bends and Fittings
etc=0.8m
Calculation of Capacity of
Pump
Table 2.6 Calculation for Capacity of Pump.
|
Density of water
|
Acceleration due to gravity
|
Friction loss
|
Drawdown
|
Velocity head
|
SWL
|
Annual Fluction
|
Delivery head
|
Other
|
Efficiency
|
Total head
|
Discharge
|
Power of Pump
|
|
kg/m3
|
m2/s
|
M
|
m
|
M
|
m
|
m
|
m
|
m
|
η
|
m
|
m3/s
|
watts
|
|
P
|
G
|
hf
|
S
|
R
|
SWL
|
Af
|
Dh
|
|
|
H
|
Q
|
|
|
1000
|
9.81
|
0.51
|
22.8
|
0.09
|
10
|
4
|
5.5
|
0.8
|
0.75
|
43.7
|
0.04
|
24007
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Providing
10% of excess allowance
|
|
25150
|
||||||||||
|
Capacity of
Pump KW
|
25.15
|
|||||||||||
|
Capacity of
Pump HP
|
33.71
|
|||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
Say
|
35.00
|
|
Therefore,
it is recommended to install the pump of capacity 35 HP having 45m head for
discharging 40 lps.
|
||||||||||||
Power Consumption Calculation
To assess the maximum power demand, if
required, the maximum KVA for the well for n numbers of pump is given by
Maximum KVA demand =
Table 2.7 Calculation of Power Demand.
|
Total Head
|
Acceleration due to gravity
|
Discharge
|
Pump assembly Efficiency
|
Safety factor
for pump
|
Power of Pump
|
Power Factor of
|
Number of pump
|
KVA demand
|
|
m
|
m2/sec
|
M3/s
|
|
|
ip
|
|
|
(ip * n)/pf
|
|
ht
|
G
|
Q
|
Η
|
sf
|
kw
|
pf
|
n
|
|
|
43.7
|
9.81
|
0.04
|
0.75
|
1.1
|
25.15
|
0.8
|
1
|
31.44
|
|
Providing 10% of excess allowance Maximum KVA demand
|
34.58
|
|||||||
|
Available transformer capacities in the market are in
the standard rating of 25KVA, 50KVA, 100KVA and so on. Hence matching
transformer capacity for the project as per the power consumption of the pump
is 50 KVA
|
||||||||
Pumping Hours
In general,
the fortnightly irrigation requirement indicates that the first half of June is
the most critical time for irrigation. During this period the irrigation
requirement is maximum. Simple arithmetic reveals that the pump will be
operated more than 12 hours a day for the critical period of the second half of
June. This can be called within reasonable limits for a peaking period of the
agricultural year. .
2.2.3 Distribution System
The
distribution system proposed is in line with the practice followed in the
construction of DTWs in ILC, NISP, IWRMP and present programs. However, it is
considered that a separate pump house will not be needed if the distribution
system is fed water from elevated header tank. It is because the provision for
store and a room for panel boards etc can be made within the structure
supporting the Elevated Header Tank.
The shape of
the command area is dictated by the existing physical and social situation in
the field. This holds true for the number of branches required and their
length. This will in turn govern the number and location of outlets. In spite
of the above arguments, it can still be stated that the layout of each unit
will resemble as close as possible, the shape of the optimal design.
Furthermore, the number of branches will mostly be two and if this is not
always the case, the total maximum distribution length of 1,500 metres in the
optimised model will be exceeded. This, in turn, will limit the number of
outlets. On an average, each outlet will be discharging a maximum of 40 lit/sec.
to irrigate approximately 2.5 hectares, which is very reasonable. The detailed
location of each tubewell and the shape of each of its command area in relation
to the topography and existing infrastructure have been provided in the layout
maps as model. The approximately length
of the distribution pipelines, numbers of outlets are given below.
Table
No. 2.8: Distribution System
|
DTW No.
|
uPVC Pipe
|
Number of Outlets
|
Delivery Head up to Outlet m
|
Size of Header Tank
|
Thickness of wall and slab of
the header m
|
Size of Rcc Piller
|
Size of Braces
|
Minimum Depth of Foundation
|
Diameter of Reinforce bars used
|
||
|
f=200
|
f=150
|
Total Length
|
|||||||||
|
mm
|
mm
|
L*B*H
|
m
|
m
|
m
|
||||||
|
1
|
200
|
1300
|
1500
|
15
|
5.9
|
2.2*2.2*1.2
|
0.15
|
.25*.25
|
.25*.3
|
1.20
|
6, 8, 12 & 16
|
The outlets
consist of an Alfa Alfa valve each surrounded by a concrete box with two
notches for discharging water into the field.
DISTRIBUTION
HEAD LOSS
Distribution
Head loss Calculation
|
A
|
Friction
Losses
|
||||||||
|
|
The Friction
losses along the pipeline distribution network are determined by the
Hasen-Williams formulae
|
||||||||
|
|
|||||||||
|
|
Hf
= 1.131*10^9*(Q/C)^1.852*D^-4.87*L
|
||||||||
|
|
Where,
|
|
|
|
|
|
|
||
|
|
Hf
|
|
Hydraulic
losses in the DN 160mm pipeline loop in meter.
|
|
|||||
|
|
Q
|
|
Discharge
in m3/hr
|
|
|
|
|
||
|
|
C
|
|
Frictional
coefficient (150 for uPVC pipes
|
|
|
||||
|
|
D
|
|
Effictive
diameters of pipe ("155mm" for DN 160mm pipeline).
|
||||||
|
|
L
|
|
Respective
pipelength in "m"
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
B
|
Hydraulic Gradient Elevation at Outlet
|
||||||||
|
|
Hh=Hg +Hv +Ho
|
||||||||
|
|
Where,
|
|
|
|
|
|
|
|
|
|
|
Hh
|
|
Hydrauli
gradient elevation req.at outlet.
|
|
|
||||
|
|
Hg
|
|
Ground
elevation.
|
|
|
|
|
||
|
|
Hv
|
|
Minimum
height of valve outlet above prevailing ground level.
|
||||||
|
|
Ho
|
|
Minimum
operation head req. at the outlet (Generally 0.30m).
|
||||||
|
|
|
|
|
|
|
|
|
|
|
|
C
|
Hydraulic Gradient Elevation at the Entrance
|
|
|
||||||
|
|
He = Hh +Hf +H1
|
||||||||
|
|
Where,
|
|
|
|
|
|
|
|
|
|
|
He
|
|
Hydraulic
gradient elevation req.at entrance to the distribution network
|
||||||
|
|
Hh
|
|
Hydraulic
gradient elevation req.at outlet.
|
|
|
||||
|
|
Hf
|
|
Hydraulic
losses in the DN 160mm pipeline loop in meter.
|
|
|||||
|
|
H1
|
|
Local
(miscellanions losses in the system taken as 0.30m
|
||||||
Overhead
Tank/Operator room: Water from the well shall be discharged to an elevated
storage tank by the pump. The tank is designed to store water from a 40 lps
discharge for 5 minutes. The height of the tank is designed by calculating the
hydraulic loss of the loop to the farthest outlet & can irrigate even
upland area with considerable head. An overflow pipe shall be provoked to allow
excess water to escape from the tank. The water from the tank shall be
discharged to each distribution loops through M.S. pipes of 200 mm diameter.
Adequate safety measures are essential for the tools, equipment, records,
authorized and unauthorized personnel from electric components. Hence a room
below the tank shall be built to permit the installation of switcher, power
metering and pump motor control equipment for the electrified wells. A permanent
pump operator shall control the tube well. The overhead tank hence shall serve
purposes of storing water & providing the required head. Providing
accommodation for the operator also ensures the safety of electric equipment.
The power cable from the well shall be connected via an underground HDP pipe
conduit to the control panel installed in the room below the tank.
3. Agricultural Pattern
3.1 Present landuse, cropping pattern and yeilds
3.1.1 Existing land use
Existing land
use pattern is of the study area is taken by Landuse map 1999 but there is
increasing of settlement in the area with decreasing of agriculture land so
assuming agriculture land is decreased by 10% with increase in settlement 10%.
However the sub-project area is entirely dominated by the farm fields. The
gross area of the subproject is 5000 ha in which 4300 ha is the net
agricultural land that needs water for irrigation. The remaining area is
occupied by the homesteads, road, water bodies, sandy area, grazing land,
grassy land, orchad, nursery rock. The existing land use pattern is shown in
Table 3.1
Table
3.1: Existing land use pattern
|
Land use Type
|
Area
|
|
|
Percentage
|
ha
|
|
|
Agriculture
|
|
|
|
Irrigated
low land
|
0.00%
|
0
|
|
Rain fed UPland land
|
80.00%
|
960
|
|
Un irrigated Upland
|
10
|
120
|
|
SANDY
|
5
|
60
|
|
WASTE
and BARREN LAND
|
5
|
60
|
|
Total
|
100.00%
|
1200
|
3.1.2 Present agricultural inputs
Chemical
fertilizers are used for all crops, but they are inadequate in quantities.
Organic manure is also applied with Urea, DAP etc as the chemical fertilizers, which
are widely used. Pesticides like furadine, metacid and BHC are used for maize
and no pesticide is used in other crops.In case of rice and maize, the improved
varieties are grown. In other crops, mostly local varieties of seeds are used.
The crop wise input use in existing situation is provided in Table 3.2.
Table 3.2: Present agricultural inputs for various crops
|
Particular
|
Unit
|
Paddy
|
Wheat
|
Maize
|
Pulses
|
Oilseeds
|
|
Seed
|
kg/ha
|
40.00
|
50.00
|
30.00
|
20
|
8
|
|
Org. Fertilizer
|
t/ha
|
2.87
|
2.00
|
2.00
|
0.4
|
0.4
|
|
Urea
|
kg/ha
|
40.00
|
37.00
|
23.00
|
15
|
15
|
|
DAP
|
kg/ha
|
50.00
|
25.00
|
20.00
|
10
|
10
|
|
Potash
|
kg/ha
|
25.00
|
0.00
|
10.00
|
0
|
0
|
|
Pesticides
|
NRs.
|
100
|
0.00
|
120.00
|
0
|
0
|
3.1.3 Existing cropping
pattern, intensity and yields
Monsoon paddy dominates
the present cropping pattern, covering 1276ha of irrigated land of the command
area followed by wheat, oilseed, maize and pulses. The only other crop, which
covers a significant area, is summer maize. The present cropping intensity is 111.5%
in the command area with partially dugwells and somewhere tubewells. The entire
command area has only rain fed irrigation. Table 3.3 provides the existing
cropping situation in the command area.
Table 3.3: Existing cropping area
and cropping intensity
|
S.N.
|
Crops
|
Crop Area (ha.)
|
Intensity (%)
|
Yield (ton/ha)
|
Production
(Ton)
|
Planting time
|
Harvesting time
|
|
1
|
Paddy
|
618.75
|
56.25
|
2.8
|
1732.5
|
June-July
|
Oct-Nov
|
|
2
|
Wheat
|
291.5
|
26.5
|
1.9
|
553.85
|
Nov-Dec
|
Mar-Apr
|
|
3
|
Maize
|
220
|
20.00
|
2.2
|
484
|
Apr-May
|
June-July
|
|
4
|
Musta rd
|
55
|
5.0
|
0.57
|
31.35
|
Oct-Nov
|
Feb-Mar
|
|
5
|
Lentil
|
41.25
|
3.75
|
9.70
|
400.125
|
Nov
|
Apr
|
|
|
Total
|
1226.5
|
111.5
|
|
3201.84
|
|
|
3.1.4 Farm Labour Use
The present agriculture is
based on farm labor. The ploughing is carried out with bullock cart. Male
farmers generally carry all the fieldwork including ploughing, land preparation
and transportation of fertilizers, while female populace is involved in
transplanting of paddy, nursery beds, and organic manure. The average inputs of
the farm labor has been assessed and presented in table 3.4.
Table 3.4
Present Farm Labour Use
|
Particular
|
Unit
|
Paddy
|
Wheat
|
Oilseeds
|
Maize
|
Potato
|
|
Labor
|
No
|
80
|
50
|
80
|
70
|
50
|
|
Animal with owner
|
No
|
25
|
25
|
7
|
15
|
7
|
3.1.5 Agricultural Support Services
Due to favorable location
of the subproject area and good accessibility from the district headquarters,
the agriculture support service is good compared to the extension and other
agricultural support services available in the district. Agriculture inputs can
be obtained from Jaleshower and Gausala, within distance of 10 km from the
subproject area. District Agriculture Office, Mahottari provides agricultural support service to the
farmers through its service centers and sub-centers
3.2 Proposed agricultural development
3.2.1 Future cropping pattern and intensity
The proposed irrigation
development will bring certain changes in the existing cropping practice in the
subproject area. It has been estimated that with the availability of assured
irrigation water existing cropping intensity of 111.5% will increase to 250%.
The cropping area as well as intensity for different crops for with project
scenario has been given in Table 3.6.
Table 3.6: Future cropping area and cropping intensity
|
Expected
net benefit in future at Full development (Cultivated Area: 1200 ha)
|
||||||
|
SN
|
Crops
|
Areal
Coverage
|
Net
Return
|
Total
Benefit
|
||
|
ha
|
NRs./ha
|
NRs
|
||||
|
1
|
Paddy
|
1200
|
- 14,300.0
|
-17,160,000
|
||
|
2
|
Wheat
|
600
|
- 18,145.0
|
-10,887,000
|
||
|
3
|
Maize
|
500
|
- 7,067.5
|
-3,533,750
|
||
|
4
|
Mustard
|
50
|
12,420.0
|
621,000
|
||
|
5
|
Lentil
|
50
|
12,420.0
|
621,000
|
||
|
6
|
Vegetables
|
600
|
69,690.0
|
41,814,000
|
||
|
Total
|
3000
|
|
|
|||
|
Cropping intensity (%)
|
|
250
|
Total
|
11,475,250
|
||
3.2.2 Proposed input use and
anticipated crop yields
It is anticipated that
there would be slight enhancement in the use of chemical fertilizers and
pesticides after the implementation of the subproject. These changes have been
anticipated with a consideration that the farmers would have a tendency to
optimize benefits from the subproject after the availability of assured supply
of irrigation water. The inputs required for each of the crops proposed in with
project scenario have been given in Table 3.7 Similarly; Table 3.8 provides the
anticipated crop yields in the subproject.
Table 3.7:
Proposed agricultural inputs for various crops
|
Particular
|
Unit
|
Paddy
|
Wheat
|
Maize
|
Oilseeds
|
Potato
|
|
Seed
|
Kg/Ha
|
66.00
|
129.00
|
25.00
|
15.00
|
1116.00
|
|
Org.
fertilizer
|
t/ha
|
1.5
|
1.00
|
0.75
|
1.2
|
2.00
|
|
Urea
|
Kg/ha
|
100.00
|
100.00
|
65.00
|
50.00
|
80.00
|
|
DAP
|
kg/ha
|
60.00
|
50.00
|
25.00
|
87.00
|
50.00
|
|
Potash
|
kg/ha
|
50
|
42
|
50
|
33
|
100
|
|
Pesticides
|
NRs.
|
500.00
|
200.00
|
400.00
|
200.00
|
250.00
|
4. SOCIO ECONOMIC PROFILE
4.1 Demographic Characteristics
4.1.1 Population
The population of the
study area is about 192457 of which the composition of male and female lies
almost in nearly equal proportion. The population is increasing with an average
growth of 2.6 percent. The population with respect to ethnic composition in the
project area is presented in table 4.1.
Table 4.1 Populations and Ethnic
Composition
|
Ethnic Group
|
Chhetri
|
Brahman
|
Magar
|
Muslim
|
Yadav
|
Koyiri
|
Teli
|
Dhanuk
|
Mushar
|
|
Populaiton
|
1.61%
|
8.35%
|
2.56%
|
13.51%
|
15.33%
|
5.20%
|
4.35%
|
6.26%
|
3.29 %
|
4.2 ECONOMY AND OCCUPATION
4.2.1 Occupations and sample households
The trade in agriculture produces between the district's
town and rural centers mainly comprise surplus produce other than paddy, maize
produce. An increased flow of rice and wheat is noted in the markets of Jaleshowr,
Gausala and Bardibas and the rates are lower than the local produce of the
district.
4.2.2 Economically active population
Agriculture is the main occupation for about 90
percentage of the total economically active population of the study area. Other
occupation is the service, carpentry and daily wage workers. In total half the
population of the study area is economically active.
5. SUBPROJECT COST AND ECONOMIC ANALYSIS
5.1 Proposed Work
Table 5.1: List of Proposed
Infrastructure
|
S.N.
|
Description of work
|
Nos.
|
Remarks
|
||
|
For Mahottari, Dhanusa and Sarlahi wells
|
|||||
|
1
|
Deep Tubewell development and testing
|
28
|
|
||
|
3
|
Electro-mechanical Works
|
28
|
Transformer of 50 KVA
=28
Submersible pump of 35Hp 28
Pannel board 28
|
||
|
4
|
Civil works (Distribution System and pump house)
|
28
|
Upvc length = 1500 m
Outlet = 15
Pump house = 28
|
||
5.2 ANALYSIS OF RATES
The cost of subproject has been computed based on
estimation of each identified work items. The analysis of each item is done
with department of irrigation norms for construction work and local market rate
and approved district rates of Mahottari district. The rates of tube well
construction are taken from the practices of Groundwater irrigation project
office. The rates of electro-mechanical components are based on the prevailing
market rates and as applicable in the past. However, these need to be verified
during the project approval and implementation. The tentative cost of per
tubewell and total cost of the project is as table 5.2
5.3 QUANTITY AND COST ESTIMATES
The summary of costs is presented in tabular form (Table 5.2).
The farmers will also contribute 15% in capital cost of the project through
organized WUA. The contribution of WUA is in either cash form or in labor
contribution allocated and presented in table 5.4.
Table 5.2 Summary of Project Cost To
rehave DTW
|
S.N
|
Description of items
|
Unit
|
Qty.
|
Rate
|
Amount (Rs.)
|
|
|
|
Tube well development
|
|
|
|
|
|
|
1
|
Development and pump test of deep tube well,
|
TW
|
28
|
304454
|
8524712
|
|
|
|
Civil works(Distribution System)
|
|
|
|
|
|
|
2
|
Construction of pump house with overhead tank and
buried uPVC water distribution system all complete work
|
No.
|
28
|
2578172.76
|
72188844
|
|
|
|
Electro-Mechanical components
|
|
|
|
|
|
|
3
|
Supply and installation of Electrical Submersible pump
including all accessories
|
Set
|
28
|
474507
|
13286196
|
|
|
4
|
Electrification of well site with 11 kVA transmission
line with 50 kVA transformer all complete
|
Set
|
28
|
624547
|
17487316
|
|
|
|
Environmental Mitigation
|
|
|
|
|
|
|
5
|
Environmental
Management and Mitigation Cost
|
LS
|
|
|
1200000
|
|
|
Total Part -A
|
112687068.00
|
|||||
|
General Items
|
|
|
|
|
||
|
i
|
Insurance
of work @ 0.15% of Part A
|
|
|
|
169030.60
|
|
|
ii
|
Third
Party Insurance @ 0.15 % of Part A
|
|
|
169030.60
|
||
|
iii
|
Insurance
agnainst accident of workman @ 0.15% of Part A
|
169030.60
|
||||
|
Sub Total : B
|
507091.80
|
|||||
|
Sub Total : C = A+B
|
113194159.8
|
|||||
|
VAT @ 13% of A
|
14649318.84
|
|||||
|
Contengencies @ 5% of A
|
5634353.4
|
|||||
|
Physical Contengencies @ 10 % of A
|
11268706.8
|
|||||
|
Price Escalation Contengencies @ 10 % of A
|
11268706.8
|
|||||
|
Total Cost of Tubewell Unit
|
155015245.6
|
|||||
|
Total Cost of Tubewell Unit
|
249667745.30
|
Table
5.3 WUA's Component of Labor Contribution Work
|
SN
|
WUA
contribution part
|
Amount
|
|
1
|
E/w in
excavation for preparing Pipe line trench and back filling after Pipe
laying and making embracement for
field channel from each outlet and other item works, Supervision in pump
& transformer, transportation of material (@15% of total cost)
|
16903060.2
|
|
Total for 1 Tubewell Unit =
|
16903060.2
|
|
The project rehab cost is NRs. 112687068.00
whereas project
construction for The total cost of the project includes mainly three parts:
cost of civil works, cost of tube well development including supply of
necessary fittings, and the cost of electro-mechanical components. The cost of
civil works comprises the cost of pumps house with overhead tank, distribution
system with uPVC buried pipelines, and construction cost of field channels. The
cost of tube well includes the cost of developing, testing of tube wells, and
mobilization of work. Similarly, the cost of electro-mechanical components
includes the cost of construction materials, cost of 11-KV electrical line
materials with 50 KVA distribution transformers, and cost of electrical
submersible pump with its accessories.
5.4 ANALYSIS OF PROJECT COSTS AND BENFITS
On an average, the net annual increase of benefit by
project is estimated as Nrs 9563.00 per ha. The total estimated annual benefit
from the subproject is 11,475,250 Total estimated project cost 112687068.00. The cost per unit of this Ground Water
Irrigation Project is worked out as Nrs 4024538.14 that gives per hectare cost
of Nrs 93905.89
5.5 ECONOMIC ANAYSIS
The economic analysis of the project is computed based on
proposed cropping pattern giving significant returns from the project after second
and third year of the project completion. The economic cost of the project is
taken by following the standard norms. The construction works are planned to
invest the project within three years. The economic life of the subproject is
assumed to be 20 years In economic analysis the project gives the benefit-cost
ratio of 1.73 at 10% discount rate along with EIRR of 28.38% at base cost.
5.6. Implementation schedule and contract management
The sub-project shall be implemented following the
suggested implementation guidelines. The total period for full implementation
cycle will take about 3 years. The preparatory activities such as WUA ( re
management and reorganizing) should be
completed, VDC wise detailed feasibility should be completed. After the completion of the sub-project a
post-implementation activities shall also be conducted to enhance the operation
and maintenance of the DTW irrigation and crop diversification. Details of
implementation scheme are presented in annex (Form 23).
7. CONCLUSION AND RECOMMENDATIONS
7.1 CONCLUSION
The feasibility study of Ground Water Irrigation project
will conducted following standard practices to best meet the objectives and
scope. The project with 1200 ha commands area can be irrigated easily with
proposed ground water rehabilitation irrigation project. This rehabilitation irrigation
is feasible as the area already has basic infrastructure such as road access
and electrification net work in most of the area. There are no problems of tube
well interference, environmental issues, which would otherwise create hindrance
against the smooth implementation of the rehab scheme. The project is free from
social and technical problems. Economically, the subproject is viable with cost
benefit ratio of 1.75 at 10% discount rate at base cost and EIRR of 28.38% at
base cost. The cost per hectare for the subproject has been worked out as NRs. 93905.89
with the implementation of the project, the cropping intensity of the command
area could be increased to 250 percent. It is observed
that the farmers should change their cropping pattern from their traditional
one that is they should give priority in vegetable or cash crops to get maximum
benefit from their imputes so that the traditional way of cropping will not
provide much benefit from the imputs.
7.2 RECOMMENDATIONS
Ground Water irrigation in the area is technically
feasible to provide irrigation facilities of 1200ha and economically viable
with economic analysis. Before implementation the tube wells should be tested
to prevent unnecessary expenditure. If tube well does not work it should be
reconstructed since it has been proved that the tube well having 40 lps
capacity can constructed in the area with very conform. Farmers should change
their cropping pattern from their traditional one that is they should give
priority in vegetable or cash crops to get maximum benefit from their imputes
so that the traditional way of cropping will not provide much benefit from the
inputs. With this conclusion it can be concluded that the project should be implemented.